---
title: "Airport Construction — Five Star Building Corp"
description: "Five Star Building Corp builds restaurants, retail, and airline spaces inside live terminals. Active at BOS, BDL, CVG & CHS — serving East Coast airports and mobilizing as far west as Kentucky and Texas."
canonical: "https://www.fivestarbuildingcorp.site/"
source: "https://www.fivestarbuildingcorp.site/"
generated: "2026-10-07"
lang: "en"
---

[413.966.1547](tel:14139661547)

Airport Construction · Tenant Fit-Out · Boston Logan & Beyond

# We build inside live terminals.

Five Star Building Corp delivers **brand-standard restaurants, retail, and airline spaces** in active airport terminals — badged crews, overnight phasing, Massport/TSA-grade compliance, and openings that don't slip.

[Talk with our airport team](tel:14139661547)
[Start a terminal project conversation](mailto:rbernard@fivestarcorp.net?subject=Terminal%20project%20conversation)

**200+** Airport projects delivered & underway

**10,722 SF** Largest single terminal build-out (Boston Duty Free)

**4** Active presence: BOS · BDL · CVG · CHS

**5 AM** Daily turnover standard on overnight gate work

A different kind of jobsite

## Airports punish contractors who are learning on your dime.

Inside a terminal, the rules change. Every worker is badged and escorted. Materials move on the airport's clock, not yours. Grease duct, hood systems, and life safety tie into **the terminal's own utilities and building automation**. Barricades have to look finished, because passengers walk past them all day. And most of the real work happens **after the last flight boards**.

We already operate in that world. Our teams hold SIDA badging experience, plan phased overnight shifts with hard daily turnover times, and run coordination across **Massport, TSA, fire, health, and building authorities** — while the terminal keeps serving passengers a few feet away.

That's why airlines, national food brands, travel retailers, and concession developers have trusted us at one of the most tightly regulated airports in the country: **Boston Logan International**.

Also on our board
More airport work

| | | |
| --- | --- | --- |
| Lucca Restaurant | BOS | Full-service dining, custom bar & millwork |
| Hudson Standalone | BOS · Term B | Fast-track retail fit-out, branded storefront |
| Hudson Dunkin' | BOS · B/C Conn | QSR build-out, POS & life-safety integration |
| Potbelly | BOS | QSR to national brand standards |
| Peet's Coffee | BOS | Café fit-out, brewing & filtration systems |
| Buffalo Wild Wings | BOS · Term A | Kitchen ventilation & HVAC renovation |
| Southwest Airlines | BDL | ATO, ramp ops & gate refresh |

Proof, not promises

## Built at Boston Logan.

Restaurants, quick service, coffee, luxury retail, airline spaces, and airport infrastructure — delivered under active terminal conditions across five Logan terminals: A, B, the B/C Connector, E, and Satellite A. Every photo below is our work.

Image: Completed Cava restaurant serving passengers in Terminal B at Boston Logan

Terminal B · Fast Casual · 2026

### Cava

- Full fit-out: demolition, drywall, flooring, electrical, HVAC, plumbing, gas & sprinkler
- Graphic-wrapped temporary barricades kept the concourse presentable throughout
- Union labor, badging, and airport work rules built into the plan from day one

Image: Completed Dave's Hot Chicken storefront with illuminated signage at Boston Logan Terminal B

Terminal B · QSR · 2026

### Dave's Hot Chicken

- Construction management for the brand's Logan Terminal B buildout
- Full kitchen, branded storefront, and graffiti-art finish package
- Massport regulations and terminal operations managed end to end

Image: Berkshire Farm to Flight before and after: bare shell to finished market in eight weeks

Terminal B · Dining Market · 2026

### Berkshire Farm to Flight

- 1,381 SF dining store — bare shell to open in an 8-week schedule
- MEP, finishes, and coordination of owner-furnished tile, millwork & signage
- Built for The Paradies Shops under airport noise and cleanliness restrictions

Image: Completed Gachi Sushi and Noodles dining room with red seating at Boston Logan Terminal E

Terminal E · Restaurant · 2026

### Gachi Sushi & Noodles

- GMP delivery in Logan's international terminal
- Concrete, finish carpentry, drywall, signage, and full MEP scope
- Security camera and low-voltage systems furnished and installed

Image: Completed Half Moon Empanadas counter with digital menu boards and mural at Boston Logan Satellite A

Satellite A · Fast Casual · 2026

### Half Moon Empanadas

- Compact ~350 SF tenant improvement — proof that small footprints get full attention
- Demolition, coring, millwork, epoxy flooring, and complete MEP
- Massachusetts State Building Code (10th Ed.) and airport-specific compliance

Image: Refreshed Delta hold room with new seating and carpet at Boston Logan Terminal A

Terminal A · Airline Space

### Delta Hold Room Refresh

- Phased overnight work in controlled sections across active gate areas
- Every work zone turned back to the airline by 5:00 AM daily
- Off-site seating assembly and staged delivery to minimize terminal impact

Image: Delta check-in hall with replaced kiosks at Boston Logan Terminal A

Terminal A · Airline Space

### Delta Kiosk Replacement

- Kiosk replacement across Delta's Terminal A check-in hall
- Electrical demolition, new circuits, and data coordination
- Executed around live ticketing operations

Image: Fox and Flight full-service restaurant and bar dining room at Boston Logan Terminal A

Terminal A · Full-Service Restaurant & Bar

### Fox & Flight

- 2,965 SF restaurant and bar; seating for 100+ guests, ~218 occupants
- Full kitchen build-out, custom bar, millwork banquettes, mosaic logo wall
- Turnover to Massport and Paradies Lagardère Travel Retail

Image: Boston Duty Free retail floor with illuminated signage at Boston Logan Terminal E

Terminal E · Luxury Travel Retail

### Boston Duty Free

- 10,722 SF luxury duty-free build-out with custom millwork and premium fixtures
- Integrated MEP, fire alarm, and life-safety upgrades in an active international terminal
- Coordinated with Massport and Marketplace Logan; delivered on time

Image: Consolidated Rent-A-Car customer service hall with rental brand counters at Boston Logan

Boston Logan · Airport Infrastructure

### ConRAC — Consolidated Rent-A-Car

- Key role in one of Logan's largest transportation infrastructure projects
- Customer service center and back-of-house for 8 rental car brands
- Phased, multi-tenant construction under strict airport security guidelines

How we work airside

## The live-terminal playbook.

A

**Security & badging**

SIDA/airport badging experience, escorted access, airside deliveries, and TSA-compliant site control from day one.

B

**Night & off-hours phasing**

Phased work plans with hard daily turnover — spaces back in service before the first departure, every morning.

C

**Agency coordination**

Permitting and inspections across airport authority, fire, health, and building departments — managed as one schedule.

D

**Commercial kitchens**

Hood systems, grease duct, gas piping, refrigeration, and equipment connections built into existing terminal MEP.

E

**Millwork & brand fit-out**

Custom casework, bars, banquettes, storefronts, and signage that pass brand-standard review the first time.

F

**Fire & life safety, IT/POS**

Fire alarm, sprinkler, BAS integration, low-voltage, data, CCTV, and point-of-sale infrastructure — coordinated, tested, documented.

G

**Barricades & passenger protection**

Graphic-wrapped modular barricades, dust and noise control, and protected egress in full public view.

H

**Closeout that sticks**

O&M manuals, inspections, warranties, and coordinated turnover so your team opens for business — not punch lists.

Who we build for

## Three kinds of airport clients. One standard.

### Airlines

Hold rooms, gate areas, kiosks, ticket counters, break rooms, operations and support spaces. Refreshes done overnight, in phases, without taking a gate out of service.

### Food Service Operators

QSR, fast casual, coffee, bars, and full-service dining. Complete kitchens, brand-standard finishes, and health-department-ready delivery for operators and their concession partners.

### Airport & Travel Retail

News and gift, specialty, and duty free — from compact inline units to a 10,722 SF luxury flagship. Storefronts, custom fixtures, POS, and security infrastructure.

Beyond Boston

## Proven at Logan. Already working beyond it.

Five Star Building Corp is headquartered in Easthampton, Massachusetts, with an **active presence at Boston Logan (BOS), Bradley (BDL), Cincinnati (CVG), and Charleston (CHS)** — serving airports up and down the East Coast and mobilizing as far west as Kentucky and Texas.

Our track record was earned at Boston Logan — an airport whose security, phasing, and agency requirements are among the most demanding in the country — and the airlines who know our work there have taken us with them to other airports:

Southwest Airlines · Bradley Int'l (BDL)

**Station Refresh**

Ticketing office, ramp operations, and gates G2, G4 & G6 — new ticket counters, gate podiums, millwork, and flooring, built to Southwest's corporate facilities design guidelines.

Delta Air Lines · Cincinnati (CVG)

**Sky Club & Ramp Breakroom**

Sky Club kitchen modifications — combi oven installation, electrical upgrades, and new exhaust fans — run on third shift so club service never paused, plus a full ramp breakroom renovation.

Delta Air Lines · Bradley Int'l (BDL)

**Terminal Data Closet UPS**

UPS replacement in Delta's terminal data closet — overnight shift support, airside escorting, and airside deliveries, coordinated to protect live airline IT operations.

For airlines, brands, and concession developers with programs at other airports, we bring the same team, the same playbook, and the same overnight discipline wherever the work is.

No satellite-office promises — just a proven airside playbook, a leadership team that travels, and partners who already trust us with their brand inside a terminal.

How an engagement starts

## From first call to first shift.

**A 15-minute conversation**

Tell us the airport, the space, and the date you need to open. We'll tell you honestly how we'd approach it.

**Drawings & budget**

We review your documents at any stage — 60%, 90%, or IFC — and return a clear budget, GMP, or hard bid with real qualifications.

**Badging, permits, phasing**

We line up badging, agency permits, barricade plans, and the night-work schedule before mobilization.

**Build & open**

Phased construction with daily turnover, weekly reporting, and a closeout package that lets you open on schedule.

Your next terminal project

## Let's talk before your next bid goes out.

What would it mean for your schedule to have a GC who has already solved the airport part?

[Call 413.966.1547](tel:14139661547)
[Email our airport team](mailto:rbernard@fivestarcorp.net?subject=Terminal%20project%20conversation)

Richard Bernard · Estimator / Director of Business Development
[413.966.1547](tel:14139661547)  ·  [rbernard@fivestarcorp.net](mailto:rbernard@fivestarcorp.net)  ·  [fivestarcorp.net](https://fivestarcorp.net/)
123 Union Street, Suite 200, Easthampton, MA 01027

Five Star Building Corp © 2026 · General Contracting · Construction Management · Design-Build
[Visit our main site — fivestarcorp.net](https://fivestarcorp.net/)
